30MW Electrode Hot Water Boiler to Brest in Belarus
20. Dec 2019

30MW Electrode Hot Water Boiler to Brest in Belarus

The new 10kV High Voltage boiler will be installed at CHP South for Bereza Brestenergo in cooperation with Aquaecology. This is our second of three deliveries to Belarus.



30MW Electrode Hot Water Boiler to Brest in Belarus

PARAT to deliver 30MW Electrode Hot Water Boiler to Brest in BelarusBerezovskaya GRES is a thermal power station located in the city of Beloozersk.


PARAT to deliver complete Boiler and Control Panel with S7-400 PLC. Our customer is responsible for the primary circuit and further boiler equipment. This has been designed and developed in cooperation with PARAT Halvorsen. Design Temperature is 176°C with 8 barg pressure. Installation at Berezovskaya GRES will take place in the 2Q of 2020.

Berezovskaya GRES is a thermal power station located in the city of Beloozersk, Berezovsky district of the Brest region of the Republic of Belarus, one of the largest power plants in the country. The Capacity of the station is 1095MW.

PARAT to deliver 30MW Electrode Hot Water Boiler to Brest in Belarus PARAT to deliver 30MW Electrode Hot Water Boiler to Brest in Belarus




Meet us:
E-World Energy & Water (Essen, Germany) Hall: 3 Stand: 161 > 11-13 February 2020
All-Energy (Glasgow, Scotland) Stand: M51 > 13-14 May 2020
Nor-Fishing (Trondheim, Norway) Hall: A Stand: tba > 18-21 August 2020
SMM (Hamburg, Germany) Hall: B7 Stand: tba > 08-11 September 2020

More information

PARAT IEH

Electrode Boiler
pdf



News

Go to news archive