New order to deliver complete steam system for Eastern Shipbuilding NB 177
14. Aug 2018

New order to deliver complete steam system for Eastern Shipbuilding NB 177

The Steam System will be used for the trawlers processing plants. We will also deliver complete hot water systems for the domestic heating.



New order to deliver complete steam system for Eastern Shipbuilding NB 177

PARAT to deliver complete steam system for Eastern Shipbuilding NB 177
ST-115 Freezer Trawler design by Skipsteknisk. (Photo: Skipsteknisk)


Steam will be delivered by our 9 tons MCS Combined Steam Boiler utilizing the exhaust heat, the boiler is equipped with a rotary cup burner designed to use excess fish oil as a substitute to marine diesel if available. The system will be delivered with Feed water tank, pumps and excess steam dumping system. All controlled by PARAT designed PLC system.

The Hot Water System will be heated by Heat Recovery, Steam or Electricity and the potable water tank to be heated by the hot water loop.

Eastern Shipbuilding in Panama City, US will build this factory trawlers managed by Glacier Fish Company LLC, US, all design by Skipsteknisk AS of the design type ST-115.


PARAT to deliver complete steam system for Eastern Shipbuilding NB 177 PARAT to deliver complete steam system for Eastern Shipbuilding NB 177


Meet us here in 2018:

Nor-Fishing (Trondheim, Norway) Hall: T. Stand: 185 - 21-24 August 2018
SMM (Hamburg, Germany) Hall: B7, Stand: tba - 4-7 September 2018

Let us know if you want to setup a meeting, contact us for details.

More Information

Marine Boilers

Download datasheet
pdf



Uutiset

News archive