2x12MW Electrode Boiler offshore package ready for installation
26. Sep 2019

2x12MW Electrode Boiler offshore package ready for installation

The High Voltage boiler skid left our facility today heading for installation on Johan Sverdrup Phase 2 by Equinor.



2x12MW Electrode Boiler offshore package ready for installation




This hot water package is designed and produced by PARAT Halvorsen as in Flekkefjord, Norway.

The Johan Sverdrup field will be electrified from shore and is the first offshore installation to install high voltage electrode boilers to significantly reduce emissions.

PARAT has the world leading Electrode Boiler design, and we have already started similar projects with several other offshore companies.


2x12MW Electrode Boiler offshore package from PARAT Halvorsen ready for installationJohan Sverdrup is one of the five largest oil fields on the Norwegian continental shelf. (Photo: Roar Lindefjeld / Bo B. Randulff / Equinor)

More information

Svein Ingvar Hammersmark

Senior Sales Engineer

Telephone: +47 99 48 55 08

E-mail: sha@parat.no

PARAT MEH

PARAT MEH Offshore

Download datasheet
pdf

PARAT IEH

Electrode Boiler
pdf



News

Go to news archive