Tersan orders boiler package from PARAT for NB1105
23. Nov 2020

Tersan orders boiler package from PARAT for NB1105

These quality Boilers will be installed in the NB1105 Arctic Freezer Trawler and delivered to the owner PF Havborg from Faroe Islands in 2022.



Tersan orders boiler package from PARAT for NB1105

Tersan orders boiler package from PARAT Halvorsen AS for NB1105The ST-119 Arctic Freezer Trawler is designed by Skipsteknisk in Norway. The boilers are scheduled for delivery in 2021. (Photo: Skipsteknisk)


Steam will be delivered by our MCS Combined Steam Boiler utilizing the exhaust heat and is equipped with a MDO atomizing burner. PARAT will also deliver a MVH Oil-Fired Smoke Tube Boiler for Hot Water.

The system will be delivered with Feed water tank, water treatment, heat exchangers, hot water boiler, pumps and surplus steam dumping system. All controlled by PARAT designed PLC system. The Steam System will be used for the trawlers processing plants, the MVH Hot Water Boiler will be used by the central heating system.

The Arctic Freezer Trawler is a Skipsteknisk ST-119 design, being built at Tersan Shipyard in Turkey, and will be delivered to the owner PF Havborg from Faroe Islands in 2022.


Tersan orders boiler package from PARAT Halvorsen AS for NB1105The Arctic Freezer Trawler will be built at the Tersan Shipyard in Turkey. (Photo: Tersan Shipyard)



 


Tersan orders boiler package from PARAT Halvorsen AS for NB1105   Tersan orders boiler package from PARAT Halvorsen AS for NB1105

More information

PARAT MCS

Download datasheet
pdf

PARAT MVH

Download datasheet
pdf



НОВОСТИ

News archive