PARAT to deliver Steam System for a new Krill Vessel
12. Sep 2017

PARAT to deliver Steam System for a new Krill Vessel

Aker BioMarine has ordered construction of a new krill vessel NB883 from VARD Group AS worth one billion NOK.



PARAT to deliver Steam System for a new Krill Vessel

Aker BioMarine KrillfartøyThis is how Aker BioMarine's new Krill Vessel looks like.


PARAT Halvorsen AS
will deliver 2 pcs 15 ton/h MSH Oil-Fired Boilers with economizers, 1 MCS Combined Exhaust Gas/Oil-Fired boiler, Feedwater Tanks, Heat Exchangers, Water Treatment systems and Degassing Tank.

The 130m long vessel will be equipped with the latest and most advanced technology available. The vessel is developed by fishermen from Aker BioMarine and engineers from VARD. The vessel's operations will be energy efficient, with a production and processing plant capable of processing raw krill material in Antarctica.

P0img XLSuperbaKrill™ is one of the products Aker BioMarine produces that contains a lot of pure Omega 3.

Aker Biomarine Cmyk Vard 051113

More information

Marine Boilers

Download datasheet
pdf



Nouvelles

News archive