Steam boiler module for winterization of drilling rig
19. Oct 2017

Steam boiler module for winterization of drilling rig

PARAT Halvorsen has designed, produced and delivered a complete steam boiler module for the Hakuryu-5 drilling rig owned and operated by Japan Drilling Company.



Steam boiler module for winterization of drilling rig

Jdc Offshore Rig H5 L PARAT Halvorsen Steam systemThe PARAT Steam boiler module is installed on the HAKURYU-5 Semi-Submersible Rig owned by Japan Drilling. (Photo: Japan Drilling)


The module consist of two PARAT MPV Vertical Oil-Fired Steam Boilers, each with a capacity of 3.000kg per hour along with feed water pumps, water treatment system and fuel arrangements. The module is ABS approved and has its own internal ventilation system and is fitted with an autonomous CO2 fire suppressant system.


Steam boiler module for winterization of drilling rig for Japan Drilling, PARAT HalvorsenThe finished Steam boiler module by PARAT Halvorsen AS, ready to be shipped out and installed on the Hakuryu-5 drilling rig. (Photo: PARAT Halvorsen AS)


PARAT is very proud to have been selected by JDC to supply this unit which was used to winterize the rig in order to perform drilling operations on the continental shelf of the Okhotsk Sea in Russia. 'In an email from JDC officials they confirmed that the drilling operation was a success and the boilers were operated continuously without problems.'


Steam boiler module for winterization of drilling rig, inside, Japan Drilling, PARAT HalvorsenThe ABS approved module consist of two PARAT MPV vertical oil fired steam boilers and is designed to be operative in cold and harsh conditions. (Photo: PARAT Halvorsen AS)


Jdc Privacy Logo

More information




新闻

News archive