New Retrofit MCS Combined Boiler to Iceland
Hraðfrystihúsið Gunnvör HF will install a complete new Retrofit MCS Combined Exhaust Gas/Smoke Tube Boiler on Stern Trawler by PARAT Halvorsen
One of the Stern Trawlers owned by Hraðfrystihúsið Gunnvör HF.
For this Retrofit delivery to Hraðfrystihúsið Gunnvör HF, PARAT will install a MCS Combined Exhaust Gas / Smoke Tube Boiler for hot water. The existing burner will be used on this new boiler and existing exhaust gas boilers will be integrated in the new Control system designed by PARAT.
PARAT Retrofit solutions
We can replace your existing boiler with a new PARAT made boiler. Built after original drawings exactly to the same outer dimensions as the old one, which means it can be used with the same available space and existing connections (small modifications is sometimes required). We can make smoke tube boilers, water tube boilers, economizers for oil burners, gas burners, waste heat etc.
Read more about our Retrofit solutions here