Murueta orders MCS Combined Steam Boiler for NB326
The PARAT Combined Steam Boiler will be installed in the NB326 Stern Freezer Trawler and delivered to the owner Royal Greenland in 2022.
The ST-119 Stern Freezer Trawler is designed by Skipsteknisk in Norway. The boiler is scheduled for delivery late 2021. (Photo: Skipsteknisk)
Steam will be delivered by our MCS Combined Steam Boiler utilizing the exhaust heat and is equipped with a MDO atomizing burner. PARAT will also deliver 2 electrical heaters (250 and 400kW) for Hot Water.
The system will be delivered with Feed water tank, water treatment, heat exchangers, electrical heaters, pumps and surplus steam dumping system. All controlled by PARAT designed PLC system. The Steam System will be used for the trawlers processing plants, the electrical heaters will be used by the central heating system. This is the fourth trawler PARAT deliver our MCS Combined Steam Boiler for to Murueta Shipyards.
The Stern Freezer Trawler is a Skipsteknisk ST-119 design, being built at Astilleros de Murueta Shipyard in Spain, and will be delivered to the owner Royal Greenland when finished.
The Stern Freezer Trawler will be built at the Astilleros de Murueta Shipyard in Spain. (Photo: Murueta Shipyard)